WasatchWind
Writer, musician, creator of worlds
- Joined
- Feb 7, 2021
- Messages
- 397
- Points
- 103
Writing sites like Wattpad already have this as a feature - that the author can choose in what order stories appear.
If such a thing is too difficult, perhaps just allowing the user to change the sorting. I'm not sure why it sorts so that oldest is on top - I think it would more likely be the opposite.
If such a thing is too difficult, perhaps just allowing the user to change the sorting. I'm not sure why it sorts so that oldest is on top - I think it would more likely be the opposite.